SLB Launches Direct Lithium Extraction System

SLB has announced the commercial launch of its direct lithium extraction system following successful tests in Nevada, aiming to produce lithium for electric vehicle batteries by 2027. The company plans to build a plant capable of producing 10,000 metric tons of lithium per year at a competitive cost.
Sources (2)
Open Article
ScoreValue
Scale

6

Novelty

7

Positivity

6

Reliability

7

Actionability

3

Society

7

Journalism

4


Highlights

  • SLB will commercially launch its direct lithium extraction (DLE) system after tests in Nevada.
  • The company aims to produce lithium for clients by 2027.
  • SLB's DLE technology can extract about 90% or more of lithium from brines.
  • The company plans to design a commercial plant with a capacity of 10,000 metric tons per year.
  • SLB believes it can produce lithium for less than $5,000 per metric ton.